We have 18 hours warning and 3 hours notice on moving day! There are so few people that offer this type of
moving service that we are at their mercy when it comes to scheduling. Here they are putting the first beam
into position.

Both beams are in and connected to custom built hydraulic trucks on both sides.
The house is lifted and doesn't fall apart


The front and back support beams are removed since they will not be needed now.
We are left with quite a mess to clean up now! After pulling out the support posts, we discover that there is no
footing. They poured the tubes and just let the excess concrete pool around the edges, creating an upside down mushroom.


The concrete foundation is cut to accommodate the beams.

The house is almost in position. The only damage was to the new french doors installed last year which
torqued when put on a level frame. Turns out we didn't even need to take our pictures off the walls, so little
was disturbed inside the house.